Things have been going at a fast and furious pace! We left off with no windows and open walls. In the two months since the last update we now have an all new electrical system and insulation! No more empty wooden box that's freezing in the mornings and baking in the afternoon!

Insulation!!

Insulation!!

Insulation!!

Insulation!!

With the insulation in, we moved on to having the windows and french door put in. This first picture is a shot of the window in the master bedroom. This is a window we had put in.

Windows!

Along with windows, we had the sheetrock put in. No more bare wooden walls!

Windows!

Windows!

French door in kitchen!

Living room getting covered up

Kitchen space (no windows yet)

With the sheetrock up, the next step was taping the seams. They did a great job.

Taped sheetrock (aka drywall)

Taped sheetrock

With the sheetrock all taped, next came a few coats of mud and texture. You can't see it really well in the picture, but trust me that's what's there. This is a shot of the soon-to-be-kitchen!

Kitchen space
With the walls all ready to go, the next step... why priming and painting of course! Priming and painting every square inch of the house...

Christina and Cindy

Shout out to Christina for flying up to lend a hand!

Somewhere along the line the kitchen cabinets came and were set in place. We also had to pick the colors for the house. You can see that on the far wall in this next picture.

Cabinets arrived!

Looking good.

All in place!

Oh, and did we mention we upgraded the siding of the house? A lot of it was rotting away and with the new windows put in, we decided to liven it up. Can you tell the difference? :)

Siding getting put up. Shout out to Edward and James, our contractors.

New siding up! Now all we need to do is pick a house color...
And then, after a few weeks of painting every free moment we had, here is a shot of myself priming our master bedroom wall just minutes from finishing!

Finishing touches!!

That's it for now! All our appliances came today and we're going to have the quartz counter delivered Friday. We'll go another round with the painting (we're doing it ourselves to save enough money to redo our second bathroom), this time with actual colors! Whoo hoo!

Stay tuned and I'll try to update again in a few weeks rather than a few months.

Target move in date: Last week of June. We'll see if we can make it!!

Sunday, March 11, 2012

Demo - Check, Rough Framing - Check, Electrical / Network - In Progress

What can I say? I'm bad at uploading pictures. We finished up the demo and spent a good few days cleaning up.

Here's a laundry list of things we've done in the past two months, NOT chronological order:
- The dump truck has now been filled - three times.
- Rough framing is done.
- Electrical wires are just about done being pulled.
- Kitchen layout is marked on the ground.
- Light fixture locations have all been marked.
- Old windows have been removed (most of them).
- New windows have been ordered (coming soon).
- A special shout out to Dave, helping us bring the house into the 21st century with CAT6 and Coax cables pulled.
- The garage walls, driveway, walkway and sidewalk have all been pressure washed.
- Garage had exposed metal ties that needed to be cut with a grinder.
- Cindy went to town painting on a sealant in the garage that will hopefully help the bare concrete walls fare a little better.
- Brick fireplace has been resurfaced.
- New kitchen / dining room flooring has been picked.
- A special shout out to Jack for helping us install ties that tie our walls to the roof.
- Dug new drainage trench and laid new pipe in backyard patio area; had to lug hundreds of pounds of concrete and drainage gravel up to the backyard. Shout out to Jack and Vince for saving my back, literally (Cindy adds - And bank account).

Rough framing in progress
More rough framing in progress
The last piece of demo work - garage!
Jack using a palm nailer to install ties
Jack's handy work!
Completed living / dining room rough framing
No more kitchen window!
Rough framing for kitchen french doors!
Corner window in master bedroom removed and new post installed for new windows.
Interior view of master bedroom corner window; before post.
New window in master bedroom! Scene of new window seat.
View of new master bedroom window; as seen from backyard concrete slab.
Running Cat6 / Coax cables to network the house; Gigabit ethernet network here we come.
Network / Phone / Mail center
Dave grinding.
Jason grinding.
Ties cut, Cindy going to town painting on the gray sealant.
After four hours - almost done!
New fireplace!

Wednesday, January 4, 2012

Demo Day ... what day is it? [Remodel day 23]

I've stopped counting the days since we've been hitting the house in a few hour chunks. Before heading down to L.A. for Christmas, we had more Chevron friends come out. Below is Amar up on a box putting the finishing touches on our master bedroom.

In the New Year, we were back at it hitting the kitchen / dining room with a vengeance. We took down the ceiling and will begin working on tearing up the floor before the week's out!

Shout out to Amar. It looks like he has a patch over his eye, but that's just a reflection... I promise!

The last of the ceiling down!!